New construction roof installation from bare framing to finished roofing system, coordinated with general contractors and building inspectors. We verify roof framing matches engineered truss plans before sheathing, pull the pre-dry-in inspection required before any finish roofing goes down, and calculate net free area ventilation to meet code and manufacturer requirements. Material selection covers everything from builder-grade 3-tab to architect-specified standing seam metal or clay tile, with energy code compliance for cool-roof requirements in applicable climate zones.
If you notice any of these issues, contact a licensed CA roofing contractor for a professional assessment.
Building a new home or commercial structure from the ground up
Adding a room addition, garage, or accessory dwelling unit (ADU)
Converting a flat roof to pitched on an existing structure
Major structural renovation that requires a completely new roof system
Building a detached shop, barn, or outbuilding that needs a roof
Architect has specified a roofing system that requires new-construction installation methods
we review architectural drawings and provide accurate material quantities before the first sheet of plywood goes down
we schedule and pass the building department's pre-dry-in inspection before any finish roofing is installed, avoiding costly tear-off re-inspections
net free area (NFA) calculated to 1:150 or 1:300 ratio per code, balancing intake and exhaust for manufacturer warranty compliance
Title 24, IECC, or local energy code requirements for cool-roof products, radiant barriers, and minimum R-value insulation
we work within your construction schedule, coordinating with framers, HVAC, and electrical before and after dry-in
Every project follows a structured process so you know exactly what to expect at each stage.
Architectural plan review and material takeoff
Roof framing verification against engineered plans
Sheathing installation (plywood or OSB per spec)
Pre-dry-in inspection by building department
Ice and water shield at code-required locations
Synthetic underlayment installation
Drip edge and eave metal
Primary roofing material installation (shingle, metal, tile)
Step flashing and counter flashing at all intersections
Ventilation system installation per calculated NFA requirements
Penetration flashing for all vents, pipes, and mechanical curbs
Final roofing inspection and certificate of completion
Free inspections • Same-day estimates • CA-licensed crews
We install manufacturer-certified products from industry-leading brands — each backed by warranty protection and proven performance in CA weather conditions.
Every installation includes manufacturer warranty registration plus our workmanship guarantee — up to 50-year material coverage and 25-year labor warranty.
| Option | Cost | Lifespan | Best For |
|---|---|---|---|
| Architectural Shingles | $4-7/sq ft | 25-30 years | Most new residential construction, best value |
| Standing Seam Metal | $12-22/sq ft | 40-70 years | Modern homes, long-term investment, solar-ready |
| Concrete or Clay Tile | $10-20/sq ft | 50-75 years | Mediterranean, Spanish, Southwest architecture styles |
| Composite/Synthetic Slate | $12-18/sq ft | 40-60 years | Slate look without the structural weight requirements |
Typical range: $10,000 – $50,000+. Highly variable based on material choice, roof complexity (hips, valleys, dormers), square footage, and local code requirements
Every new roof installation project from Davis Roofing & Maintenance includes a complete service package — no hidden fees, no surprise charges.
New construction roofing in Sacramento must comply with California building code and local energy code requirements, which may mandate cool-roof products, reflective materials, or minimum R-value insulation depending on climate zone. High-wind and hurricane-zone states require specific fastening patterns and hurricane strap connections. Northern climate zones require ice and water shield at all eaves per IRC R905.1. Accessory dwelling unit (ADU) and room addition projects create consistent demand for new-construction roofing on smaller structures — permit and inspection requirements apply regardless of structure size.
"Couldn't believe how clean the job site was when they left. Three passes with the magnet, swept the driveway, cleaned the gutters out. My wife said the yard looked better than before they showed up."
"We were quoted $18,500 for a 32-square replacement with Timberline HDZ. They hit the number exactly. No change orders, no surprise fees. That's rare in this business."
"Our insurance company tried to lowball us on the storm claim. Davis Roofing & Maintenance supplemented the estimate and got it approved for $7,000 more. They know the Xactimate system better than the adjuster did."